Details of Major Projects in 2013

NO. Project Description Client
1. Design and Development of Power Management System. NDI SCADA is used for high-level control, and Woodward easYgen 3200 devices are used to synchronize 2 diesel engine generators, 1 steam turbine generator and 1 gas engine generator. Automatic engine starting, load-sharing, load shedding and blackout recovery functions are implmeneted through PLC and easYgen systems. MISC FSO ABU, Malaysia
2. DGPS/RTK based technology is used for Gantry Auto-Steering System (GASS). 13 units of E-RTGs have been equipped with GASS. The accurcy is 100mm, and maximum gantry speed is 135 meters per minute. Northport, Malaysia
3. DGPS/RTK based technology is used for Gantry Auto-Steering System (GASS). 4 units of E-RTGs have been equipped with GASS. The accurcy is 100mm, and maximum gantry speed is 95 meters per minute. Port of Haiphong, Vietnam
4. Integrated Control Room (ICR) for bulk terminal. Completed in January 2013. Jurong Port, Singapore
5. Two sets of Rain Monitoring System. Jurong Port, Singapore
6. Development of new Shuttle Car control system. Recall Center, Singapore
7. Development of new Shuttle Car control system. Recall Center, Singapore
8. Retrofitting of control system for two ASRS cranes. Singapore Airport Terminal Services (SATS), Singapore