Details of Major Projects in 2014

NO. Project Description Client
1. Designed and developed Brake Monitoring System (BMS) for ICAN brakes in April 2014. ICAN,Japan
2. Designed and developed the control system for movable roof transportation system of the National Stadium of Singapore,and it was delivered in June 2014. SportsHub,Singapore
3. Tested the synchronization system between the busbar and GenSet for E-RTG in Dec 2014. PTP,Malaysia